INDY100 Logo
Saturday, August 21, 2027 • Official Courses

The Routes

Three signature circuits connecting Central Indiana's premier rail corridors and open country roads. Select a course below to explore sector breakdowns.

Rest Stops & SAG Schedule & Waves
Community / Quarter Century

25 Mile Route

25.0 Miles (40.2 km) +350 ft Elevation
Official Route Specification: Monon Trail & 42nd Street (Start), North on Monon Trail to 106th Street, East on 106th Street utilizing protected sidepaths and the White River connector bridge, South on Nickel Plate Trail from 106th Street to 42nd & Evanston Avenue, West on 42nd Street to Finish at Monon Trail & 42nd Street.
The Greenway Spine

North on Monon Trail to 106th Street (Miles 0.0 – 11.5)

25M • Sector 1

Roll out north from Monon Trail & 42nd Street onto the continuous paved Monon Greenway. Cruise north past Broad Ripple, Marott Park, and northern Marion County into Carmel over dedicated grade-separated trail bridges to 106th Street.

Cross-Corridor Connector & River Bridge

East on 106th Street to Nickel Plate Trail (Miles 11.5 – 13.5)

25M • Sector 2

Turn East on 106th Street utilizing wide, protected multi-use sidepaths and the dedicated White River connector bridge to complete the lateral connection to the Nickel Plate Trail.

Southbound Rail Corridor

South on Nickel Plate Trail from 106th St to 42nd & Evanston (Miles 13.5 – 24.0)

25M • Sector 3

Intercepting the continuous paved Nickel Plate Trail, riders cruise south through Fishers and northern Indianapolis down to the southern trailhead terminus at 42nd & Evanston Avenue.

Closing Link & Finish

West on 42nd Street to Finish Line (Miles 24.0 – 25.0)

25M • Sector 4 (Final)

Exit NPT at 42nd & Evanston Ave, riding the final sector west along 42nd Street back to Monon Trail & 42nd Street to cross under the official finish timing arch and complete the 25-mile community loop.

Signature Metric Century • The Midland Trace & Rail Loop

62.1 Mile / 100km Route

62.2 Miles (100.1 km) +1,050 ft Elevation
Official Route Specification: Monon Trail & 42nd Street (Start), North on continuous Monon Greenway through Broad Ripple and Carmel into Westfield (including Grand Park calibration loop), East along the grade-separated Midland Trace Trail across central Hamilton County directly into Noblesville, South through the Pleasant Street Multi-Use Trail Corridor, South on the uninterrupted Nickel Plate Trail (NPT) through Fishers to 42nd & Evanston Avenue, West on 42nd Street to Finish at Monon & 42nd Street.
Nearly 100% Traffic-Separated & Car-Free Circuit

Heads north along the continuous Monon Greenway into Westfield, incorporates a 4-mile calibrated pacing spur toward Grand Park to lock in exact distance, transitions seamlessly eastbound along the grade-separated Midland Trace Trail across central Hamilton County directly into Noblesville, joins the Pleasant Street Multi-Use Trail Corridor, and sprints straight south on the uninterrupted Nickel Plate Trail (NPT) back into Indianapolis.

Monon Northbound

Depart Monon & 42nd St to Westfield (Miles 0.0 – 21.0)

62M • Sector 1

Depart Monon & 42nd Street, pacing through Broad Ripple, Carmel Arts & Design District, Midtown Carmel, and into Westfield along the continuous grade-separated paved rail trail corridor.

Grand Park Calibration Loop

Monon Greenway Grand Park Extension (Miles 21.0 – 25.1)

62M • Sector 2

Out-and-back spur along the Monon Greenway extension toward Grand Park in Westfield to calibrate exact metric distance before making the eastbound turn.

Midland Trace Corridor

East on Midland Trace Trail to Noblesville (Miles 25.1 – 34.0)

62M • Sector 3

Turn East directly onto the Midland Trace Trail. Clean, car-free greenway connecting Westfield across central Hamilton County to Noblesville, completely avoiding SR 32 traffic.

Pleasant Street Connector

Multi-Use Paths & Underpasses to NPT (Miles 34.0 – 37.0)

62M • Sector 4

Cross through Noblesville via the grade-separated multi-use paths and pedestrian underpasses, directly intercepting the northern trailhead of the Nickel Plate Trail at Pleasant Street.

Nickel Plate South

Noblesville to 42nd & Evanston Ave (Miles 37.0 – 61.2)

62M • Sector 5

Direct rail-trail run south from Noblesville through Fishers to 42nd & Evanston Avenue along the continuous, flat converted railway corridor.

Final Mile & Finish Arch

West on 42nd Street to Finish Line (Miles 61.2 – 62.2)

62M • Sector 6 (Final)

West along 42nd Street to the finish line arch and chip-timing gantry at Monon & 42nd Street to conclude the 100-kilometer metric century.

Premier Imperial Century • The Rural Grid & Potter's Bridge Bypass

100 Mile Route

100.2 Miles (161.3 km) +1,780 ft Elevation
Official Route Specification: Monon Trail & 42nd Street (Start), North on Monon to 216th St / County Line, North on Boone-Hamilton County Line Rd to 296th St, East on 296th St, South on Anthony Rd, East on 256th St, South on DeVaney Rd / 236th St to Cumberland Rd past Potter's Bridge Park to White River Greenway, South through Pleasant Street multi-use underpass to Nickel Plate Trailhead, South on continuous Nickel Plate Trail through Fishers to 42nd & Evanston Ave, West on 42nd Street to Finish at Monon & 42nd Street.
Low-Traffic Agricultural Corridors • Grade-Separated Trail Connections

Features low-traffic, paved county grid corridors across northern Hamilton County. After reaching the northernmost turn at 296th Street, riders shift east to Anthony Road, 256th Street, and DeVaney Road, track south along Cumberland Road past historic Potter’s Bridge Park, and enter the Nickel Plate Trailhead via the grade-separated Pleasant Street multi-use underpass.

The Greenway Spine

Rollout North to 216th St Trailhead (Miles 0.0 – 28.5)

100M • Sector 1

Roll out north from Monon & 42nd Street. Continuous grade-separated paved trail through Broad Ripple, Carmel Arts & Design District, Midtown Carmel, and Westfield to the northern trailhead at 216th Street.

The Northern Surge

Boone-Hamilton Co Line Rd to 296th St (Miles 28.5 – 48.0)

100M • Sector 2

Transition onto Boone-Hamilton County Line Road heading north. Long, wide-open farm straights to the northern county boundary at 296th Street.

Northern County Horizon

East on 296th Street to Anthony Road (Miles 48.0 – 58.0)

100M • Sector 3

Turn East on 296th Street. Open agricultural blacktop across northern Hamilton County to Anthony Road.

Quiet Farm & Reservoir Bypass

Anthony Rd / 256th St / DeVaney Rd (Miles 58.0 – 74.0)

100M • Sector 4

Turn South on Anthony Road, East on 256th Street, and South on DeVaney Road / 236th Street to Cumberland Road. Rolling country lanes, minimal cross-traffic, and expansive sightlines.

Historic River Inbound

Potter's Bridge & White River to Pleasant St (Miles 74.0 – 81.0)

100M • Sector 5

South on Cumberland Road past Potter’s Bridge Park, linking into the White River Greenway path and the new Pleasant Street multi-use corridor.

Rail Corridor Sprint

Nickel Plate South to 42nd & Evanston (Miles 81.0 – 99.2)

100M • Sector 6

Enter the Nickel Plate Trailhead at Pleasant Street. High-cadence, unobstructed straight-line run south through downtown Fishers into Marion County down to 42nd & Evanston Avenue.

Home Stretch & Finish Arch

West on 42nd Street to Finish Line (Miles 99.2 – 100.2)

100M • Sector 7 (Final)

Exit NPT at 42nd & Evanston Avenue. Ride west in a dedicated, coned lane along 42nd Street to the official finish arch and celebration hub at Monon & 42nd Street.

Hydration & Nutrition Plan

Rest Stop & SAG Matrix

Official Fueling: Hammer Nutrition

Given August heat conditions, all aid stations will supply Hammer Nutrition products, bulk ice water, electrolyte drink mix, chilled fresh fruit, basic mechanical repair triage, and emergency first aid medical kits.

Station 100M 62M 25M Location / Facility Logistics & Provisions
Start / Finish 0.0 / 100.2 0.0 / 62.2 0.0 / 25.0 Monon & 42nd St (Event Hub) Full mechanical support, hydration, medical triage, post-ride celebration meals
Rest Stop 1 Mile 14.8 Mile 14.8 Mile 10.5 Midtown Plaza Carmel Restrooms, quick hydration top-off, mechanical triage, ice water
Rest Stop 2 Mile 28.5 Mile 25.1 — Monon Trailhead / Grand Park Spur Hammer Nutrition electrolytes, energy gels, ice drop, high-volume pump station
Rest Stop 3 Mile 52.0 — — 296th St & Anthony Rd (Church Lot) Major lunch/nutrition stop, shaded misting tent, ice replenishment, hot food
Rest Stop 4 Mile 74.0 — — Potter's Bridge Park (Cumberland Rd) Shaded pavilion, cold hydration refill, sunscreen station, tire repair
Rest Stop 5 Mile 81.0 Mile 37.0 — Noblesville Pleasant St Trailhead Convergence stop: ice towels, cold water, snacks, nutrition top-off
Rest Stop 6 Mile 92.5 Mile 48.5 Mile 14.0 Fishers Nickel Plate Amphitheater Final hydration top-off, medical station, SAG sweep checkpoint
Operations & Safety Protocol

Public Safety & Traffic Control

The course architecture shifts routing entirely off state highways onto municipal park trails and paved county roads, coordinated across Hamilton County Highway Department, City of Westfield Parks, City of Carmel Parks, City of Noblesville Parks, City of Fishers Parks, and City of Indianapolis / IMPD.

Critical Traffic Control Assignments

  • 42nd Street Finish Funnel: Westbound lane closed to motorized traffic from Evanston Ave to Monon Trail using delineators and high-visibility traffic cones to establish a safe bicycle lane. IMPD traffic officers stationed at 42nd & Evanston Ave, 42nd & Keystone Ave, and 42nd & Monon.
  • Boone-Hamilton County Line Transition: Monon northern terminus crossing onto rural asphalt marked with high-visibility advisory signage and marshals.
  • Pleasant Street Multi-Use Junction: Dedicated marshals guide riders off Cumberland/Riverwalk directly onto the Pleasant Street trail underpass into the Nickel Plate trailhead.

SAG Patrol Architecture

  • Roving Fleet: 4 dedicated SAG support vans equipped with roof-mounted bike racks, heavy-duty floor pumps, spare tubes, toolkits, AED defibrillators, medical kits, and insulated ice-water tanks.
  • Zone 1 (Vans 1 & 2): Continuous patrol coverage across Marion & South Hamilton County Trails (Monon, Midland Trace, and Nickel Plate Trail corridors).
  • Zone 2 (Vans 3 & 4): Dedicated coverage across Northern Hamilton County Rural Loop (County Line Rd, 296th St, Anthony Rd, 256th St, DeVaney Rd, and Cumberland Rd).
Race Day Operations

Event Schedule & Wave Protocol

Saturday, August 21, 2027

To prevent crowding recreational trail users and optimize course pacing, riders are released in disciplined waves based on target average speeds.

05:30 AM – 07:00 AM
Staging & Check-In

Volunteer check-in, mechanic pit open, and day-of packet pickup at Monon & 42nd St Event Hub.

07:00 AM – 08:30 AM
Staggered Wave Launches

Wave 1 (07:00 AM): 100M Century (75 riders / 3 min).
Wave 2 (07:45 AM): 62M Metric (75 riders / 3 min).
Wave 3 (08:30 AM): 25M Community rolling departure.

02:00 PM – 04:30 PM
Course Sweeps

02:00 PM: Northern rural loop sweeps close (Anthony Rd & 296th St).
04:30 PM: Nickel Plate Trail sweep closes at 42nd & Evanston Ave.

05:00 PM
Course Closed

Course officially closes; timing cut-off enforced; Finish Line festival celebration concludes.

Operational Notice

General Operational Disclaimer • Event Tentative Status

The event date is set for Saturday, August 21, 2027. With the exception of this confirmed date, all operational aspects of the INDY100SM—including all rides, course routes, distance profiles, trail corridors, road alignments, elevation data, event schedules, staging times, wave launch protocols, course cut-offs, rest stop & aid station placements, Hammer Nutrition provisions, and roving SAG patrol support—are tentative and subject to acts of God, severe weather, municipal permitting requirements, public safety authority directives, road construction, change, alteration, or cancellation until the successful completion of the event.